Solabedar plan in the form of an integrated package of operation-oriented plan to maintain and increase the production of 28 selected reservoirs of the NISOC
Location: Kohgiluyeh and Boyer-Ahmad Province, Solabedar region.
Description: This project is carried out by conducting detailed engineering studies, purchasing equipment and carrying out executive operations and installing equipment in order to increase and maintain production in Gachsaran oil field as follows: 1- Dismantling the solaber cluster unit 3 and constructing a new separation and boosting set with a capacity of 10,000 barrels per day, which includes: process equipment and ancillary units and 3 pumps each with a capacity of 5,000 barrels per day. 2- Construction of 49 km of 8-inch gas pipeline from Solabdar to Bibi Hakimeh 1, along with cannon catchers, cannonballs and cannon catchers, 6-inch oil pipeline sent from Chahar Bishe unit to Solabdar 3- Construction of thermal CCTV system for Bibi Hakimeh oil and gas facilities 4- Construction of 19 km 33 kW single circuit power transmission line from the substation 5- Complex 145 in order to supply electricity, separation and strengthening of Solabdar oil pressure complex