
{"id":1987,"date":"2021-09-25T16:00:18","date_gmt":"2021-09-25T12:30:18","guid":{"rendered":"https:\/\/bgkco.com\/?p=1987"},"modified":"2022-12-17T12:52:09","modified_gmt":"2022-12-17T09:22:09","slug":"solabedar-power-transmission-line","status":"publish","type":"post","link":"https:\/\/bgkco.com\/en\/2021\/09\/25\/solabedar-power-transmission-line\/","title":{"rendered":"Project of constructing a 33 KV power transmission line with 2 substations at the beginning and end of the route by the EPC method of Solabeder oil field"},"content":{"rendered":"<p style=\"text-align: center;\"><strong>S<\/strong><strong>ubj<\/strong><strong>ect of the Contract: <\/strong>Carrying out engineering services, purchase and supply of goods, construction, installation and commissioning of the 33 KV power transmission line construction \u00a0Project with 2 posts at the beginning and end of the route in the EPC method of the Solabedar oil field<\/p>\n<p style=\"text-align: center;\"><strong>C<\/strong><strong>on<\/strong><strong>tract No.: <\/strong>053-073-9187\/001<\/p>\n<p style=\"text-align: center;\"><strong>Employer: <\/strong>National Iranian Oil company \u201cNISOC\u201d<\/p>\n<p style=\"text-align: center;\"><strong>Period of the Contract: <\/strong>24 months<\/p>\n<p style=\"text-align: center;\"><strong>Y<\/strong><strong>ear of Performance: <\/strong>2021-2023<\/p>\n<p style=\"text-align: center;\"><strong>B<\/strong><strong>r<\/strong><strong>i<\/strong><strong>ef Description of activities:<\/strong><\/p>\n<p style=\"text-align: center;\">&#8211; Preparation and supply of mechanical equipment, instruments and electricity for the project<\/p>\n<p style=\"text-align: center;\">&#8211; \u06f1\u06f9 km of single-circuit 33 kV power transmission line<\/p>\n<p style=\"text-align: center;\">&#8211; Construction of 2 electrical substations<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Carrying out engineering services, purchase and supply of goods, construction, installation and commissioning of the 33 KV power transmission line construction \u00a0Project with 2 posts at the beginning and end of the route in the EPC method of the Solabdar oil field<\/p>\n","protected":false},"author":1,"featured_media":1991,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22],"tags":[],"_links":{"self":[{"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/posts\/1987"}],"collection":[{"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/comments?post=1987"}],"version-history":[{"count":5,"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/posts\/1987\/revisions"}],"predecessor-version":[{"id":2167,"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/posts\/1987\/revisions\/2167"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/media\/1991"}],"wp:attachment":[{"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/media?parent=1987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/categories?post=1987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bgkco.com\/en\/wp-json\/wp\/v2\/tags?post=1987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}